Development projects in Mustang have been affected by a shortage of petroleum products after the Ben-joomsom road was blocked by floods and landslides. The key highway connecting Mustang with Korala has remained fully obstructed for six days following heavy rainfall, floods and river erosion between Ashwin 8 and 11. Only 700 litres of diesel was supplied to a fuel station