The installation of a 74-metre Bailey bridge over the Phalakhु Khola at Betrabati, connecting Nuwakot and Rasuwa districts, has reached its final stage. The Nepal Army placed the bridge base on the Rasuwa-side abutment on Friday, with only the installation of the driving deck remaining. The remaining work is expected to take up to three days, and the Army aims