A devastating flood in the Bhote Koshi River in Rasuwa has damaged several hydropower projects, taking around 430 MW of electricity out of Nepal’s national grid. The disruption has affected power supply through the Trishuli Corridor to Balaju and Chapali in Kathmandu, increasing pressure on the transmission lines. The Ministry of Energy, Water Resources and Irrigation is working on alternative