The Bhote Koshi flood in Rasuwa on Bhadra 10 has caused extensive damage to Nepal’s energy and irrigation infrastructure. The Ministry of Energy, Water Resources and Irrigation estimates that rebuilding damaged hydropower infrastructure could cost around NPR 3.9 Arab, compared with an estimated investment value of NPR 1.24 Arab before the disaster. Around 430 MW of operational electricity generation capacity