Construction of the dam at the 900 MW Arun III Hydropower Project in Makalu Rural Municipality-5, Sankhuwasabha, has been halted after the water level in the Arun River increased significantly. Rising river flow has overwhelmed the temporary dam and affected the diversion tunnel, preventing proper drainage. Water has started flowing over the temporary structure and reaching the permanent dam construction