Work to install a Bailey bridge at the flood-damaged bridge in Arughat, Gorkha, is progressing rapidly after flooding in the Budhi Gandaki River damaged the existing structure. Foundation construction is underway on the Gorkha side, where part of the bridge was washed away. As the Bailey bridge is larger than the previous structure, a concrete foundation designed to set quickly is