The government has accelerated work to reopen the flood-damaged Arughat bridge connecting Gorkha and Dhading districts as soon as possible. The bridge was damaged by flooding in the Budhi Gandaki River on Sunday morning. The flood washed away a 22-metre reinforced cement concrete (RCC) section on the Gorkha side, although the existing truss structure remained intact. Following a technical assessment,